
Convert Data Center Heat Into Computing Capacity
We eliminate the cooling-power penalty so every megawatt goes to compute, not to fans.
40%
of site power lost to cooling
A megawatt on the fan stack never makes it to the GPU.
We close that gap. Waste heat enters a three-stage loop and comes back as power, revenue, and certified carbon removal.
Capture
Biomass-boosted recovery upgrades low-grade reject heat into a workable energy state.
Recycle
ORC covers cooling internally—grid megawatts route back to compute.
Sequester
Biogenic capture yields durable biochar—removal regulators and capital can underwrite.
What changes when cooling stops consuming.
Full compute capacity
Every signed MW goes to silicon. Cooling draws zero from the grid.
Self-powered cooling
ORC generation covers the thermal load internally.
Carbon negative
Physical removal via durable biochar replaces traded offsets.
District heat revenue
Exportable enthalpy under long-term municipal offtake.
EED-ready
Designed around tightening EU Energy Efficiency Directive rules.
Green bond eligible
Asset narrative that sustainability-linked lenders recognize.
Modular hardware. Zero-disruption deployment. Energy‑as‑a‑Service.
Standard interfaces, operator runbooks, and redundancy baked in. Not an experiment beside the chillers.
Field integration layer
Energy-as-a-Service

5–50+MW
Deployment range
99.99%
Uptime target
Zero
Operational disruption
Integration partners
One footprint. Four revenue lines from the same thermodynamics.
Recovered cooling load
ORC keeps megawatts on silicon.
Carbon certificates
CORC-class removal via durable biochar.
District heat sales
Municipal offtake for exported enthalpy.
Biochar offtake
Industrial and agricultural channels.
Illustrative numbers—we plug in your tariff, PPA, and municipal structure when we model together.
Computing headroom
effective capacity
Carbon credits
CORC / year
District heat
sales / year
Biochar
sales / year
Put your interconnect and tariff in one model
We scope the story on this page to your campus—constraint, loop, deployment, and ledger together.