Skip to content
Exergenic production facility
Industrial Thermal Recovery

Convert Data Center Heat Into Computing Capacity

We eliminate the cooling-power penalty so every megawatt goes to compute, not to fans.

01Solution

40%

of site power lost to cooling

A megawatt on the fan stack never makes it to the GPU.

We close that gap. Waste heat enters a three-stage loop and comes back as power, revenue, and certified carbon removal.

  • Capture

    Biomass-boosted recovery upgrades low-grade reject heat into a workable energy state.

  • Recycle

    ORC covers cooling internally—grid megawatts route back to compute.

  • Sequester

    Biogenic capture yields durable biochar—removal regulators and capital can underwrite.

02Benefits

What changes when cooling stops consuming.

Full compute capacity

Every signed MW goes to silicon. Cooling draws zero from the grid.

Self-powered cooling

ORC generation covers the thermal load internally.

Carbon negative

Physical removal via durable biochar replaces traded offsets.

District heat revenue

Exportable enthalpy under long-term municipal offtake.

EED-ready

Designed around tightening EU Energy Efficiency Directive rules.

Green bond eligible

Asset narrative that sustainability-linked lenders recognize.

03Technology

Modular hardware. Zero-disruption deployment. Energy‑as‑a‑Service.

Standard interfaces, operator runbooks, and redundancy baked in. Not an experiment beside the chillers.

Field integration layer

Energy-as-a-Service

Exergenic modular integration hardware

5–50+MW

Deployment range

99.99%

Uptime target

Zero

Operational disruption

Integration partners

Schneider ElectricVertivAlfa LavalSiemensABBCarrier
04Revenue

One footprint. Four revenue lines from the same thermodynamics.

Recovered cooling load

ORC keeps megawatts on silicon.

Carbon certificates

CORC-class removal via durable biochar.

District heat sales

Municipal offtake for exported enthalpy.

Biochar offtake

Industrial and agricultural channels.

Illustrative numbers—we plug in your tariff, PPA, and municipal structure when we model together.

Grid allocation5 MW
1 MW50 MW

Computing headroom

effective capacity

5 MW

Carbon credits

CORC / year

€2,100k

District heat

sales / year

€1,550k

Biochar

sales / year

€900k
Indicative annual upside€4,550k

Put your interconnect and tariff in one model

We scope the story on this page to your campus—constraint, loop, deployment, and ledger together.